From Concept to Delivery — Real Projects
Every project starts with your 3D file or drawing. We handle DFM (Design for Manufacturing), mold flow analysis, mold building, trial runs, and production — all documented with progress photos.
Case 1: High-Temp Engineering Part
| Material | High-temperature engineering plastic |
|---|---|
| Process | Injection molding, single-cavity mold |
| Application | Industrial equipment component |
| Challenge | Tight tolerance on mating surfaces, high-temp resistance |
| Solution | DFM-optimized gate location, controlled mold temperature, CMM verification |
Case 2: Complex Multi-Feature Housing
| Material | ABS / PC+ABS |
|---|---|
| Process | Injection molding, multi-cavity |
| Application | Electronic device enclosure |
| Challenge | Multiple snap fits, living hinges, thin walls |
| Solution | Mold flow simulation, optimized cooling channels, sequential valve gating |
Case 3: PU Foam Cushioning Component
| Material | Self-skinning PU foam |
|---|---|
| Process | Self-skinning / integral skin molding |
| Application | Equipment cushioning, sealing, thermal insulation |
| Hardness | Customizable on request |
| Challenge | Consistent skin quality, no surface defects |
| Solution | Temperature-controlled mold environment, optimized demolding time |
Case 4: Precision Mold Tooling
| Mold Steel | 8418 premium tool steel |
|---|---|
| Process | Precision CNC machining, EDM finishing |
| Application | High-precision injection mold |
Industries We Serve
- Industrial equipment & machinery
- Automotive (Tier 2/3 components)
- New energy / EV accessories
- Smart home / IoT devices
- Outdoor & sports equipment
- Construction & building materials
- Medical device housings (non-sterile)
- Consumer products
Our Projects
A selection of injection-molded parts we have produced for customers across industries.
PEI
ABS
PA66+15%GF
ABS
PPO
PSU
POM
PPO+20%GF
PA66+30%GF
PPO+20%GF-TPEE
PPO-TPEE
PA66+30%GF
PPO
PSU
How We Work
- Send 3D (STEP/IGS/STP) + 2D drawing + quantity estimate
- We return DFM report + mold design proposal + quote (≤24h)
- You approve → Mold build begins (typical 30 days)
- T0 samples sent for your approval (photo + measurement report)
- Mass production starts after sample sign-off
- QC report per batch, export packing, FOB Ningbo/Shanghai